џWPCL ћџ2BJ|xа АH аа АА X агга ХА6p&А6p&Х аеЬ† а Hh аааУ Уб cмˆ4 PŽТ б Fascicle VIII.2 Љ Rec. X.20 bis Ф ФPAGE1У Уб cмˆ4 PŽТ б ЬееЅ† а HH аааб cмˆ4 PŽТ бPAGE1У Уб cмˆ4 PŽТ б Fascicle VIII.2 Љ Rec. X.20 bis Ѕеа HH ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаа X  аб cмˆ4 PŽТ бУ УRecommendation X.20УУ bisФФ Ср8<Сб cмˆ4 PŽТ бUSE ON PUBLIC DATA NETWORKS OF DATA TERMINAL Ср8:СEQUIPMENT (DTE) WHICH IS DESIGNED FOR INTERFACING Ср8?СTO ASYNCHRONOUS DUPLEX VР-РSERIES MODEMSФ Ф Ср8?СУУб cмˆ4 PŽТ б(Geneva, 1976; amended at Geneva, 1980, Ср8;СMalagaР-РTorremolinos, 1984 and Melbourne, 1988) ФФС СThe CCITT, УУconsidering а H аФФС С(a)СpСthat the interface between Data Terminal Equipment (DTE) and Data Circuit Terminating Equipment (DCE) for startР-Рstop transmission on public data networks is specified in Recommendation X.20, а H аС С(b)СpСthat several Administrations are planning to provide as an interim measure the connection to public data networks of startР-Рstop DTEs which are designed for interfacing to VР-РSeries modems for startР-Рstop transmission, УУunanimously declares а H аФФС Сthat the interface between a VР-РSeries type DTE and a DCE in public data networks for user classes of service employing startР-Рstop transmission should be as defined in this Recommendation. аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа‚У У1ТX ТScopeФ ФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СThis Recommendation applies to the interface between a DTE designed for interfacing to duplex VР-РSeries modems for startР-Рstop transmission and a DCE on public data networks. а H аС СThe operation is limited to startР-Рstop transmission at data signalling rates and character structures specified for startР-Рstop transmission in Recommendation X.1. С СThe application comprises: Та ТТ№ ТС€ Сa)СpСcircuit switched service,ЦЦ а H аТа ТТ№ ТС€ Сb)СpСleased circuit service (pointР-РtoР-Рpoint and centralized multipoint).ЦЦ а HH ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџH јP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаТX  ТТX јТС€  СС€ HС‚У У2С  Сб cмˆ4 PŽТ бInterchange circuitsЦЦ аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаб cмˆ4 PŽТ бФ Ф2.1Тh  ТУУFunctional characteristicsФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СThe functional characteristics of the interchange circuits concerned (see Table 1/X.20УУ bisФФ) comply with Recommendation V.24. ‚Ср QСб cмˆ4 PŽТ бTABLE 1/X.20УУ bisФФ б cмˆ4 PŽТ баЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџH` Ш 0 ˜ hРpШ xxџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаСр PСааб cмˆ4 PŽТ бInterchange circuit а ј ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџ` Ш 0 ˜ hРpШ xxџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаб cмˆ4 PŽТ ба ј аб cмˆ4 PŽТ бвЦ‚@ И xЦв‡аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџ` Ш 0 ˜ џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаСрРMСб cмˆ4 PŽТ б Number аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџˆxрHРpШ xxџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаСрРJС Designation а И ј ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџИ ˆxрHРpШ xxџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаб cмˆ4 PŽТ бˆа И ј аб cмˆ4 PŽТ бвЦ‚@ И xЦв‡аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџ` Ш И 0 ˜ џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаСрXСб cмˆ4 PŽТ б 102 аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџИ ˆxрHРpШ xxџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа Signal ground or common return а И ј аб cмˆ4 PŽТ бˆа И ј аб cмˆ4 PŽТ бвЦ‚@ И xЦв‡аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџ` Ш И 0 ˜ џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаСрXСб cмˆ4 PŽТ б 103 аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџИ ˆxрHРpШ xxџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа Transmitted data а И ј аб cмˆ4 PŽТ бˆа И ј аб cмˆ4 PŽТ бвЦ‚@ И xЦв‡аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџ` Ш И 0 ˜ џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаСрXСб cмˆ4 PŽТ б 104 аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџИ ˆxрHРpШ xxџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа Received data а И ј аб cмˆ4 PŽТ бˆа И ј аб cмˆ4 PŽТ бвЦ‚@ И xЦв‡аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџ` Ш И 0 ˜ џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаСрXСб cмˆ4 PŽТ б 106 аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџИ ˆxрHРpШ xxџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа Ready for sending а И ј аб cмˆ4 PŽТ бˆа И ј аб cмˆ4 PŽТ бвЦ‚@ И xЦв‡аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџ` Ш И 0 ˜ џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаСрXСб cмˆ4 PŽТ б 107 аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџИ ˆxрHРpШ xxџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа Data set ready а И ј аб cмˆ4 PŽТ бˆа И ј аб cмˆ4 PŽТ бвЦ‚@ И xЦв‡аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџ` Ш И 0 ˜ џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаСрVСб cмˆ4 PŽТ б 108/1б cмˆ4 PŽТ бУУa)ФФб cмˆ4 PŽТ б аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџИ ˆxрHРpШ xxџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа Connect data set to line а И ј аб cмˆ4 PŽТ бˆа И ј аб cмˆ4 PŽТ бвЦ‚@ И xЦв‡аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџ` Ш И 0 ˜ џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаСрVСб cмˆ4 PŽТ б 108/2б cмˆ4 PŽТ бУУb)ФФб cмˆ4 PŽТ б аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџИ ˆxрHРpШ xxџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа Data terminal ready а И ј аб cмˆ4 PŽТ бˆа И ј аб cмˆ4 PŽТ бвЦ‚@ И xЦв‡аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџ` Ш И 0 ˜ џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаСрXСб cмˆ4 PŽТ б 109 а И  ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџИ ˆxрHРpШ xxџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа Data channel received line signal detector а И ј аб cмˆ4 PŽТ бˆа И ј аб cмˆ4 PŽТ бвЦ‚@ И xЦв‡аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџ` Ш И 0 ˜ џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаСрWСб cмˆ4 PŽТ б 125б cмˆ4 PŽТ бУУc)ФФб cмˆ4 PŽТ б аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџИ ˆxрHРpШ xxџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа Calling indicator а И ј аб cмˆ4 PŽТ бˆа И ј аб cмˆ4 PŽТ бвЦ‚@ И xЦв‡аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџ` Ш И 0 ˜ џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаСрWСб cмˆ4 PŽТ б 141б cмˆ4 PŽТ бУУd)ФФб cмˆ4 PŽТ б аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџИ ˆxрHРpШ xxџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа Local loop back а И ј аб cмˆ4 PŽТ бˆа И ј аб cмˆ4 PŽТ бвЦ‚@ И xЦв‡аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџ` Ш И 0 ˜ џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаСрXСб cмˆ4 PŽТ б 142 аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџИ ˆxрHРpШ xxџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа Test indicator а И ј аб cмˆ4 PŽТ бˆа HH ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаадаУУб cмˆ4 PŽТ б a)б cмˆ4 PŽТ бФФ Used in case of automatic control of the direct call facility. УУб cмˆ4 PŽТ бb)б cмˆ4 PŽТ бФФ Used in case of switched data network service. УУб cмˆ4 PŽТ бc)б cмˆ4 PŽТ бФФ Not provided in leased circuit service. а H аУУб cмˆ4 PŽТ бd)б cмˆ4 PŽТ бФФ Not provided in those networks which do not provide automatic activation of the test loops. аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаааб cмˆ4 PŽТ б2.2Тh  ТУУElectrical characteristicsФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СThe electrical characteristics of the interchange circuits comply with Recommendation V.28, using the 25Р-Рpole DTE/DCE interface connector and contact number assignments in ISO Standard 2110. аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа‚У У3ТX ТUse of interchange circuitsФ ФЦЦ 3.1Тh  ТУУOperation of interchange circuit 107 Р-Р Data set readyФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СThis circuit is used to indicate the operational functions given in Table 2/X.20УУ bisФФ. ‚Ср QСб cмˆ4 PŽТ бTABLE 2/X.20УУ bisФФ б cмˆ4 PŽТ бвЦ‚ˆxЦв‡аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџH` Ш 0 ˜ ˆџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаСр MСб cмˆ4 PŽТ бCondition of circuit 107 Ср KС Meaning in the data network а ј ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџ` Ш 0 ˜ ˆџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаб cмˆ4 PŽТ бˆа ј аб cмˆ4 PŽТ бвЦ‚ˆxЦв‡б cмˆ4 PŽТ б ON Ready for data (see Note) а ј аб cмˆ4 PŽТ бˆа ј аб cмˆ4 PŽТ бвЦ‚ˆxЦв‡б cмˆ4 PŽТ б OFF DCE clear indication а ј аб cмˆ4 PŽТ бˆа ј аб cмˆ4 PŽТ бвЦ‚ˆxЦв‡б cмˆ4 PŽТ б OFF DCE clear confirmation а ј аб cмˆ4 PŽТ бˆа  ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаадаб cмˆ4 PŽТ бУУNoteФФ Р-Р Since no circuit 105 is operated, the ON condition on circuit 106 is applied 0 to 20 milliЉseconds after circuit 107 is turned ON. а HH ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаааб cмˆ4 PŽТ б3.2Тh  ТУУUse of interchange circuits 108/1 and 108/2ФФЦЦ Та ТС€ HС3.2.1С јСУУCircuit 108/1 Р-Р Connect data set to lineФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СThis circuit is used alternatively to circuit 108/2. The operational functions given in Table 3/X.20УУ bisФФ should be indicated. ‚Ср QСб cмˆ4 PŽТ бTABLE 3/X.20УУ bisФФ б cмˆ4 PŽТ бвЦ‚ˆxЦв‡аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџH` Ш 0 ˜ ˆџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаСр LСб cмˆ4 PŽТ бCondition of circuit 108/1 Ср KС Meaning in the data network а ј ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџ` Ш 0 ˜ ˆџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаб cмˆ4 PŽТ бˆа ј аб cмˆ4 PŽТ бвЦ‚ˆxЦв‡б cмˆ4 PŽТ б ON а а а Call request for direct call (see РSР 3.4.1) а ј аб cмˆ4 PŽТ бˆа ј аб cмˆ4 PŽТ бвЦ‚ˆxЦв‡б cмˆ4 PŽТ б ON Call accepted а ј аб cмˆ4 PŽТ бˆа ј аб cмˆ4 PŽТ бвЦ‚ˆxЦв‡б cмˆ4 PŽТ б OFF DTE clear request а ј аб cмˆ4 PŽТ бˆа ј аб cмˆ4 PŽТ бвЦ‚ˆxЦв‡б cмˆ4 PŽТ б OFF а   а DTE clear confirmation (see РSР 3.4.4) а ј аб cмˆ4 PŽТ бˆа HH ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаТа Т3.2.2СP СУУCircuit 108/2 Р-Р Data terminal readyФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СThis circuit is used alternatively to circuit 108/1. The operational functions given in Table 4/X.20УУ bisФФ should be indicated.‚б cмˆ4 PŽТ б Ср QСTABLE 4/X.20УУ bisФФ б cмˆ4 PŽТ бвЦ‚ˆxЦв‡аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџH` Ш 0 ˜ ˆџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаСр LСб cмˆ4 PŽТ бCondition of circuit 108/2 Ср KС Meaning in the data network а ј ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџ` Ш 0 ˜ ˆџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаб cмˆ4 PŽТ бˆа ј аб cмˆ4 PŽТ бвЦ‚ˆxЦв‡б cмˆ4 PŽТ б ON Call accepted а ј аб cмˆ4 PŽТ бˆа ј аб cмˆ4 PŽТ бвЦ‚ˆxЦв‡б cмˆ4 PŽТ б OFF DTE clear request а ј аб cмˆ4 PŽТ бˆа ј аб cмˆ4 PŽТ бвЦ‚ˆxЦв‡б cмˆ4 PŽТ б OFF а   а DTE clear confirmation (see РSР 3.4.4) а ј аб cмˆ4 PŽТ бˆа HH ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаТа Т3.3СP СУУCircuit 125 Р-Р Calling indicatorФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СThe ON condition indicatesУУ incoming callФФ. The circuit will be turned OFF as follows: Та ТР-РТ№ Тin conjunction with circuit 107 turned ON, orЦЦ Та ТР-РТ№ ТУУDCE readyФФ is received from the network, orЦЦ Та ТР-РТ№ ТУУDCE clear indicationФФ is received from the network.ЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа3.4Тh  ТУУOperational requirements for circuits 106, 107, 108/1, 108/2 and 109ФФЦЦ Та ТС€ HС3.4.1С јСУУCall request for direct callФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СFor aУУ direct callФФ facility the DTE indicates a call request by turning circuit 108/1 ON. Circuit 108/2 cannot be used for this purpose. аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаТа ТС€ HС3.4.2С јСУУCall acceptedФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СA DTE receiving anУУ incoming callФФ should turn circuit 108/1 or 108/2 from OFF to ON within 500 ms to indicateУУ call acceptedФФ, otherwise the call will be cleared. A DCE presenting anУУ incoming callФФ to a DTE which already has circuit 108/2 ON will regard the ON condition on circuit 108/2 as an indication ofУУ call acceptedФФ. а H аС СOptionally when a DTE does not provide circuit 108/1 or 108/2, theУУ call acceptedФФ signal to the network would be generated within the DCE as an answer to theУУ incoming callФФ signal received from the network. However, it may also be possible to signal to the network aУУ DTE controlled not readyФФ by a manual action on the DCE. аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаТа ТС€ HС3.4.3С јСУУOperation of interchange circuits 109 and 106ФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СThe DCE switches circuit 109 to ON together with circuit 107. Circuit 106 is put to ON 0 to 20 ms after the appearance of the ON condition on circuit 107. а H аС СThe circuits 109 and 106 are switched to OFF either when circuit 108 is switched to OFF or when circuit 108 is ON and the DCE signalsУУ DCE clear indicationФФ (see РSР 3.4.4). аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаТа ТС€ HС3.4.4С јСУУDCE clear indication and DTE clear confirmationФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СУУDCE clear indicationФФ is signalled to the DTE by turning circuit 107 OFF. TheУУ DTE clear confirmationФФ, when implemented, should be given by the DTE turning OFF circuit 108/1 or 108/2 within 500 ms after theУУ DCE clear indicationФФ is signalled on circuit 107. Otherwise, the DCE may consider the DTE as beingУУ uncontrolled not readyФФ until circuit 108/1 or 108/2 is turned OFF or aУУ readyФФ signal is generated by a manual action on the DCE. С СCircuit 108/1 should always be able to giveУУ DTE clear confirmationФФ. С СOptionally, when a DTE does not turn circuit 108/2 OFF forУУ DTE clear confirmationФФ this would be automatically generated within the DCE as an answer to theУУ clear indicationФФ received from the network and the DTE will be considered in theУУ readyФФ condition. С СIn the case when the DTE expects to have circuit 107 OFF only as a response to circuit 108/1 or 108/2 OFF, the DCE will not turn circuit 107 OFF as aУУ DCE clear indicationФФ and in this case the DCE indication will not be signalled to the DTE across the interface. The necessaryУУ DTE clear confirmationФФ signal will then be automatically generated within the DCE as an answer to theУУ clear indicationФФ signal received from the network. The DTE may be regarded asУУ uncontrolled not readyФФ until circuit 108/1 or 108/2 is turned OFF. аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџH јP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаТX  ТТX јТС€  СС€ HС3.4.5С јСб cмˆ4 PŽТ бУУCentralized multipoint operationФФЦЦ аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаб cмˆ4 PŽТ бС СAs the circuits 106 and 109 are always in the ON condition, the transmission disciplines must be determined by endР-РtoР-Рend control procedures of the DTEs. аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа‚У У4ТX ТCall progress signals and DCE provided informationФ ФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СУУCall progress signalsФФ andУУ DCE provided informationФФ cannot be handled by VР-РSeries DTEs. аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа‚У У5ТX ТFailure detection and isolationФ ФЦЦ аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџH јP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаТX  ТТX јТС€  СС€ HС5.1С   СУУб cмˆ4 PŽТ бFault conditions of interchange circuitsФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаб cмˆ4 PŽТ бС СIf the DTE or DCE is unable to determine the condition of circuits 107, 108/1 or 108/2 and possibly circuits 103 and 104, it shall interpret this as an OFF condition or binary 1 (circuits 103 and 104) as specified in the relevant electrical interface specifications. аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа5.2Тh  ТУУDCE fault conditionsФФЦЦ аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СIf the DCE is unable to provide service (e.g. loss of incoming line signal) for a period longer than a fixed duration it will turn circuit 107 to the OFF condition. The value of this duration is network dependent. аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа5.3Тh  ТУУTest loopsФФЦЦ аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СThe definitions of the test loops and the principles of maintenance testing using the test loops are provided in Recommendation X.150. аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџH јP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаТX  ТТX јТС€  СС€ HС5.3.1С јСб cмˆ4 PŽТ бУУDTE test loop Р-Р type 1 loopФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаб cмˆ4 PŽТ бС СThis loop is used as a basic test of the operation of the DTE, by looping back the transmitted signals inside the DTE for checking. The loop should be set up inside the DTE as close as possible to the DTE/DCE interface. С СExcept as noted below, while the DTE is in loop 1 test condition: Та ТР-РТ№ Тcircuit 103 is connected to circuit 104 inside of the DTE;ЦЦ а H аТа ТР-РТ№ Тcircuit 103 as presented to the DCE must be in the binary 1 condition;ЦЦ а H аТа ТР-РТ№ Тcircuit 108/1 or 108/2 may be in the same condition as it was before the test;ЦЦ а H аТа ТР-РТ№ Тcircuits 140 and 141, if implemented, must be in the OFF condition.ЦЦ а H аС СThe conditions of the other interchange circuits are not specified but they should if possible permit normal working. а H аС СLoop 1 may be established from either theУУ data transferФФ phase or theУУ idleФФ phase. С СIf the loop is established from theУУ data transferФФ phase, the DCE may continue to deliver data to the DTE during the test as though the DTE were а H аin normal operation. It will be the responsibility of the DTE to recover from any errors that might occur while the test loop is activated. а H аС СIf the loop is established from theУУ idleФФ phase, the DTE should continue to monitor circuit 125 so that an incoming call may be given priority over a routine test.аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа Та Т5.3.2СP Сб cмˆ4 PŽТ бУУLocal test loop Р-Р type 3 loopФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаб cмˆ4 PŽТ бС СLocal test loops (type 3 loops) are used to test the operation of the DTE, the interconnecting cable and either all or parts of the local DCE, as discussed below. а H аС СWhere allowed by national testing principles loop 3 may be established from any state. аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџH јP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС  СFor testing on leased circuitsй€ leased circuitsйб cмˆ4 PŽТ б and for short duration testing, on circuitР-Рswitched connectionsйKб cмˆ4 PŽТ б circuitР-Рswitched connectionsKй the DCE should continue to present toward the line the conditions that existed before the test (e.g. eitherУУ data transferФФ orУУ readyФФ state). Where this is not practical (e.g. in some cases for loop 3a) or desirable (e.g. for long duration testing in circuitР-Рswitched applications) the DCE should terminate an existing call. С  СManual control should be provided on the DCE for activation of the test loop. С  СThe automatic activation on this loop, if provided, should be controlled by circuit 141. С  СThe precise implementation on the test loop within the DCE is a national option. At least one of the following local test loops should be implemented. аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаТHТС€HСб cмˆ4 PŽТ б5.3.2.1СјСУУLoop 3dФФЦЦ аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СThis loop is used to test the operation of the DTE, including the interconnecting cable, by returning transmitted signals to the DTE for а H аchecking. The loop is set up inside the local DCE and does not include interchange circuit generators and loads. С СWhile the DCE is in the loop 3d test condition: Та ТР-РТ№ Тcircuit 103 is connected to the circuit 104;ЦЦ Та ТР-РТ№ Тcircuits 107 and 142 are placed in the ON condition.ЦЦ а Hx аС СУУNoteФФ Р-Р While test loop 3d is operated, the effective length of the interconnecting cable is doubled. Therefore, to insure proper operation of loop 3d, the maximum DTE/DCE interface cable length should be oneР-Рhalf the length normally appropriate for the data signalling rate in use. аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаТHТС€HС5.3.2.2СјСУУLoop 3cФФЦЦ аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СThis loop is used to test the operation of the DTE, including the interconnecting cable and DCE interchange circuit generators and loads. а H аС СThe configuration is identical to that given for loop 3d in РSР 5.3.2.1 with the exception that the looping of circuit 103 to circuit 104 includes the interchange circuit generators and loads. The notes concerning restriction of interface cable length and load input impedance are not applicable. аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаТHТС€HС5.3.2.3СјСУУLoop 3bФФЦЦ аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СThis loop is used as a test of the operation of the DTE and the line coding and control logic and circuitry of the DCE. It includes all the circuitry of the DCE with the exclusion of the line signal conditioning circuitry (e.g., impedance matching transformers, amplifiers, equalizers, etc.). The delay between transmitted and received test data is a few octets. (See Note). С СThe configuration is identical to that given for loop 3c in РSР 5.3.2.2 except for the location of the point of loopback. С СУУNoteФФ Р-Р In some networks the setting of loop 3b will cause clearing of existing connections. аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаТHТС€HС5.3.2.4СјСУУLoop 3aФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СThis loop is used to test the operation of the DTE and the DCE. The loop should include the maximum amount of circuitry used in DCE working including, in particular, the line signal conditioning circuitry. It is recognized that, in some cases, the inclusion of devices (e.g., attenuators, equalizers or test loop translators) may be necessary in the loopback path. The subscriber line is suitably terminated during a loop 3a test condition. а H аС СThe configuration is identical to that given for test loop 3b in РSР 5.3.2.3 except for the location of the point of loopback. С СУУNoteФФ Р-Р In some networks the setting of loop 3a will cause clearing of existing connections.аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬа Та Т5.3.3СP Сб cмˆ4 PŽТ бУУNetwork test loop Р-Р type 2 loopФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаб cмˆ4 PŽТ бС СNetwork test loops (test 2 loops) are used by the Administration's test centre to test the operation of the leased line or subscriber line and either all or part of the DCE, as discussed below. а H аС СWhere, allowed by national testing principles loop 2 may be used by a DTE, as follows: а H аТа ТТ№ ТС€ Сa)СpСIn the case of switched circuit networks in theУУ data transferФФ phase to test the operation of the network connection including the remote DCE. It should be possible to reenter theУУ data transferФФ phase after completion of the network loop test.ЦЦ а H аТа ТТ№ ТС€ Сb)СpСIn the case of leased lines in theУУ idleФФ phase to test the operation of the line including the remote DCE. When the test is in progress the DCE will return circuits 107 and 109 in the OFF condition, circuit 104 in the binary 1 condition and circuit 142 in the ON condition.ЦЦ а HH аС СThe loop may be controlled manually by a switch on the DCE or automatically by the network. The control of the loop and the method used for automatic control, when implemented, is a national option. а H аС СIn case of a collision between aУУ call requestФФ and the activation of the loop, the loop activation command will have priority and the call request is ignored. а H аС СThe precise implementation of the test loop within the DCE is a national option. One of the following network test loops should be implemented: аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаТHТС€HС5.3.3.1СјСУУLoop 2bФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СThis loop is used by the Administration's test centre(s) and/or the remote DTE to test the operation of the subscriber line and all the circuitry of the DCE with the exception of interchange circuit generators and loads. С СWhile the DCE is in the loop 2b test condition: Та ТР-РТ№ Тcircuit 104 is connected to circuit 103 inside of the DCE,ЦЦ а H аТа ТР-РТ№ Тat the interface, the DCE places circuit 104 in the binary 1 condition and circuit 109 in the OFF condition, or alternatively, may present an open circuit or power off condition on circuits 104 and 109,ЦЦ а H аТа ТР-РТ№ Тcircuits 106, 107 and 125 to the DTE are placed in the OFF condition,ЦЦ Та ТР-РТ№ Тcircuit 142 to the DTE is placed in the ON condition.ЦЦ а HH ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаТHТС€HС5.3.3.2СјСУУLoop 2aФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СThis loop is used by either the Administration's test centre(s) or the remote DTE to test the operation of the subscriber line and the entire DCE. С СThe configuration is identical to that given for loop 2b in РSР 5.3.3.1 except for the location of the point of loopback. аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџH јP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаТX  ТТX јТС€  СС€ HС5.3.4С јСб cмˆ4 PŽТ бУУSubscriberР-Рline test loop Р-Р type 4 loopФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаб cмˆ4 PŽТ бС СSubscriberР-Рline test loops (type 4 loops) are provided for the maintenance of lines by the Administrations. аЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаТHТС€HС5.3.4.1СјСУУLoop 4aФФЦЦ а H ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СThis loop is only provided in the case of 4Р-Рwire subscriber lines. Loop 4a is for the maintenance of lines by Administrations. When receiving and transmitting pairs are connected together, the resulting circuit cannot be considered normal. Loop 4a may be established inside the DCE or in a separate device. С СWhile the DCE is in the loop 4a test condition: Та ТР-РТ№ Тcircuit 104 to the DTE is placed in the binary 1 condition,ЦЦ а H№ аТа ТР-РТ№ Тcircuits 106, 107, 109 and 125 to the DTE are placed in the OFF condition,ЦЦ Та ТР-РТ№ Тcircuit 142 to the DTE is placed in the ON condition.ЦЦ а HH ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHјP Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаТHТС€HС5.3.4.2СјСУУLoop 4bФФЦЦ а H№ ааЬџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџHpи P Ј XА`ИhР!(#џџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџџЬаС СThis loop is used by Administrations to test the operation of the subscriber line including the line signal conditioning circuitry in the DCE. When the receiving and transmitting circuits are connected at this point, loop 4b provides a connection that can be considered as normal; however, some impairment of the performance is expected since the DCE does not perform a complete signal regeneration. а H аС СThe configuration is identical to that given for loop 4a in РSР 5.3.4.1 except for the location of the point of loopback.